Thermon ZP-PTD100-XP Terminator Manual de usuario Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 8
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
Installation Instructions 3
Install junction box lid and twist hand tight. Insert screw-
driver into ratchet slots located on side of junction box base.
6.
7.
12.8.
5.
Place M20 sealing washer on temperature sensor gland con-
nector. Route temperature sensor leads through M20 threaded
entry. Screw gland connector into junction box.
Install M25 power gland in M25 threaded entry.
Make sure temperature sensor body is fully inserted into
gland connector. Tighten gland connector.
Install M20 blind plugs in remaining M20 threaded entries.
Install control wiring (user supplied, 6 mm
2
max). 3 wire
cable (for 1 sensor) or 6 wire cable (for 2 sensors) with
braided earth shield is recommended.
9.
Install quick mount terminal blocks and tighten screws (if
necessary).
Complete system wiring. Terminal set screws shall be
tightened to a torque value of 1.4 Nm (12.4 lb-in). See page
4 for wiring details.
11.
10.
Vista de pagina 3
1 2 3 4 5 6 7 8

Comentarios a estos manuales

Sin comentarios