4
3.3. Feed cable and ground through expediter
base as shown. Feed cable and ground
lead through grommet (above the crimp).
3.2. Trim braid to approximately 76mm (3”).
Crimp 12/10 AWG compression lug to
ground braid and ground lead.
3.1. Separate braidstrandsat edgeofoverjacket
and pull cable through opening.
Ground Lead Wire
12/10 AWG
Crimp
Expediter
Base
Grommet
Ground
Lead
Cable
152mm
(6”)
Power connection for FLX-BC with braid only.
76mm
(3”)
Braid
3.4. Slide expediter toward pipe and secure
using two (2) circumferential bands of
19mm (3/4”) wide tape.
3.5. Place UL
®
label provided as shown,
locate on opposite side from rectangular
side opening.
Pipe Heating Cable 134N
HSX
®
or FLX™ Heating Cable System
Install Cable per NEC Article 427
Thermon Manufacturing Co.
100 Thermon Dr., San Marcos, Texas 78666
1-800-730-4328 PN 27400
Tape Provided
Separately
UL Label
3.6. Cutandremoveprimaryinsulationjacket.
3.7. Skive outside of black matrix.
3.8. Cut V-notch in matrix and pull bus wires
from matrix. Cut and remove center
matrix.
Do not cut bus wire strands.
117mm
(4-5/8”)
Bus Wire
Primary Insulation
Ground Lead
Matrix
Ground Lead
Ground Lead
Ground Lead
Black Matrix
Matrix
PCS-COM In-line and T-Splice Kit
12/10 AWG
Crimp